Beta Help us improve: share your feedback on our new website.

Overview

This report describes thermal performance improvements undertaken at The Leighton Library in Dunblane. In keeping with the preceding Refurbishment Case Studies, the aim of this work was to upgrade the property and improve its thermal performance using materials which were appropriate to the fabric of the building. 

Due to the increasing cost of heating the building there was a desire on the part of the Trustees to improve the energy efficiency of the building. In 2011 Historic Scotland awarded a grant to the Trustees to install insulation in the roof space.

Document

This file may not be suitable for users of assistive technology. If you require this document in an alternative format, please contact us.

Refurbishment Case Study 9