Beta Help us improve: share your feedback on our new website.

Overview

This case study describes thermal performance improvements undertaken at two residential properties in Rothesay, Isle of Bute, during 2011. In keeping with the preceding Refurbishment Case Studies, the aim of this work was to upgrade the property - by improving its thermal performance in a manner compatible with the existing building fabric. Three types of improvement were trialled in this Case Study; the addition of insulation to internal walls, secondary glazing to windows, and additional insulation to a door.

Document

This file may not be suitable for users of assistive technology. If you require this document in an alternative format, please contact us.

Refurbishment Case Study 10